DESCRIPTION

Rasche Hall, built in 1894, expanded in the 1950’s and home to the Cadets, is being torn down and rebuilt in the first phase of the redevelopment of the Upper Quad at VT. The new building will offer 21st-century housing concepts to meet the needs of students while intentionally maintain the heritage of the Upper Quad.

CHALLENGE

Soil conditions generally consist of up to 5 ft of clay fill underlain by soft to very stiff lean and fat residual clay extending to partially weathered pinnacled limestone bedrock. Groundwater was generally encountered near the top of rock which was as deep as 55 feet below the ground surface.

With three large mat footings 30 to 35-foot square with loads up to 3000 kips adjacent to 300 to 400 kip column footings and 15 to 40 kips per lineal foot strip footings the one big challenge was how to control settlement to less than an inch.  The adjacent footing stresses could not be controlled using aggregate piers alone (the solution specified) even if the piers were all installed up to 55 feet deep to tag rock.

Heavy-Loaded-Footings

SOLUTION

A combination of Geopier Rigid Inclusions and Geopier aggregate piers ended up being the optimal solution.  Cement treated aggregate Geopier elements were used to isolate heavy footings and transfer their loads down to bedrock. In this way, the stress from adjacent footings was eliminated. Lightly loaded footings could be supported on variable length aggregate Geopier elements which resulted in a cost effective solution.

To be able to transfer the load from the CTA Geopier rigid inclusion elements a load transfer mechanism consisting of a 12 inch thick conventional Geopier aggregate pier element was placed on top of the CTA Geopier element.  This provided the necessary load transfer to the footing and provided a shear break for seismic considerations.  It also allowed the footing excavations for all the Geopier elements to be identical for the footing contractor.

315100 Transmittal

CTA Geopier element with a 12 inch thick Aggregate Pier Load Transfer Cap

Owner

Virginia Polytechnic Institute and State University - Blacksburg, VA

General Contractor

Barton Malow - Blacksburg, VA

Architect / Structural Engineer

Clark-Nexsen Architecture & Engineering - Charlotte, NC

Geotechnical Engineer

Froehling & Robertson, Inc - Roanoke, VA

Products

Geopier X1® System

Geopier Rigid Inclusions

Additional Projects

The Yards at Three Crossing

Pittsburgh, PA

Eisenhower Avenue Soundwall

Alexandria, VA

Citterio Prosciutto Plant Expansion

Freeland, PA

North Carolina State University – Center for Technology & Innovation Parking Deck

Raleigh, NC

The Adele

Washington, DC

Costco

Oceanside, NY

Goliath Data Center (Cyrus One)

Sterling, VA

Dominion Greensville County Power Station

Emporia, VA

US Cold Storage Warehouse Expansion

Warsaw, NC

Navy Federal Credit Union Headquarters

Vienna, VA

REI @ Pike & Rose

North Bethesda, MD

Virginia Tech – Brodie Hall

Blacksburg, VA

Rowan University Rohrer College of Business

Glassboro, NJ

Grosvenor Heights

Bethesda, MD

Ambler Savings Bank

Ambler, PA

Village at Valley Forge

King of Prussia, PA

Home Depot

Cherry Hill, NJ

I-95 Express Lanes Post and Panel Walls

Prince William to Fairfax County, VA

Tappan Zee Hudson River Crossing

Nyack, NY

Fairfax County Public Safety Headquarters

Fairfax, VA

Rex Hospital Parking Garage

Raleigh, NC

Arlington Cemetery – Millennium Project

Arlington, VA

PortSouth Bryla Distribution Facility

Carteret, NJ

Potomac Yard Park North Pond Walls

Alexandria, VA

Court House Metro Plaza

Arlington, VA

Milton Wastewater Treatment Plant

Milton, PA

Walker Jones School

Washington, DC

Howard University Residence Halls

Washington, DC

New Belgium Brewery

Asheville, NC

Martha Jefferson Hospital Replacement Campus

Charlottesville, VA

Joseph C. Scott Medical Center Addition at Rydal Park

Rydal, PA

Hershey Medical Center Centerview Parking Garage Phase II

Hershey, PA

NC Specialty Hospital

Durnham, NC

Advanced Technology Research Facility – Frederick National Laboratory for Cancer Research

Frederick, MD

Specfuel Waste to Energy Plant Addition

Philadelphia, PA

Chobani Plant and Distribution Facility

New Berlin, NY

Spirit Aerosystems Composite Manufacturing Facility

Kinston, NC

Chatham Industrial Park Bebo Bridge

Fredericksburg, VA

Castle Oil Storage Tanks

Bronx, NY

Refinery

N/A

Rappahannock Regional Jail Expansion Retaining Wall

Stafford, VA

The United States Air Force Memorial

Arlington, VA

P-132 SOF Cafeteria – NAS Oceana, Dam Neck Annex

Virginia Beach, VA

Highspire Wastewater Treatment Plant Upgrade

Borough of Highspire, PA

Lehigh County Authority Flow Equalization Tank

Allentown, PA

FDA SE Quadrant Laboratories and Office Buildings 71 and 75

Silver Spring, MD

University of Mary Washington Dormitory (Eagle Village)

Fredericksburg, VA

Virginia Commonwealth University – Monroe Park Campus Dormitory and Parking Garage

Richmond, VA

Western PA School for the Deaf New Dormitory

Pittsburgh, PA

Boyce Middle School

Pittsburgh, PA

Towson University Liberal Arts Building – Phase II

Towson, MD

Augustine North Section 10 Omega Arch

Stafford County, VA

Holiday Inn Express

Alexandria, VA

East King Street Redevelopment – Eastside Flats

Malvern, PA

Westminster Place at Carroll Village

Dillsburg, PA

TownePlace Suites by Marriott

Frederick, MD

Bethesda North Marriott Hotel and Conference Center

Rockville, MD

Sunrise at Fox Hill Assisted Living

Bethesda, MD

The Oaks at North Bethesda

Bethesda, MD

The Grays on Pennsylvania Avenue

Washington D.C.

Yale Steam Laundry Building 1 Condominiums

Washington D.C.

Virginia Tech Basketball Practice Facility

Blacksburg, VA

PPG Paints Arena

Pittsburgh, PA

Riverhounds Events Center – Highmark Stadium

Pittsburgh, PA

Cattaraugus Community Sports Complex

Irving, NY

The Hockessin Athletic Club and Parking Deck

Hockessin, DE

Riggs LaSalle Recreation Center

Washington D.C.

Richmond International Airport

Richmond, VA

I-495 Capital Beltway Slope Enhancement – HOT Lanes

Fairfax, VA

KIPP DC: LEAP Academy

Washington D.C.

Capital One Headquarters – Post and Panel Wall

McLean, VA

Mosaic at Merrifield – Parcel B

Falls Church, VA

Western Wake Expressway (Triangle Expwy SR540)

Apex, NC

Village at Leesburg – Cobb Theater

Leesburg, VA

Target Store Slope Repair

Raleigh, NC

Baltimore Washington Parkway Slope Repair at Route 197 Exit

Laurel, MD

FDA East Access Road

Silver Spring, MD

11th Street Bridges

Washington, DC

The Charlotte Midtown and The Metropolitan at Midtown

Charlotte, NC

Walmart Store #3701

Mount Olive, NC

Potomac Yard Park

Alexandria, VA

Station 650 (Landbay J)

Alexandria, VA

Sands Casino Resort

Bethlehem, PA

Naval Square Biddle Hall Annex and Townhomes

Philadelphia, PA

Bakers Centre Shopping Plaza

Philadelphia, PA

Target Rochester

Rochester, NY

Sunrise at Cresskill

Cresskill, NJ

Motiva Sewaren Terminal Expansions

Sewaren, NJ

Fort Totten Station

Washington, DC

Seafrigo Cold Storage Warehouse

Elizabeth, NJ

I-495 HOT Lanes Sound Wall

Metro, VA

Westfield Wheaton Costco

Wheaton, MD

I-395 HOT Lanes

Alexandria, VA

Additional Projects

The Yards at Three Crossing

Pittsburgh, PA

Eisenhower Avenue Soundwall

Alexandria, VA

Citterio Prosciutto Plant Expansion

Freeland, PA

North Carolina State University – Center for Technology & Innovation Parking Deck

Raleigh, NC

The Adele

Washington, DC

Costco

Oceanside, NY

Goliath Data Center (Cyrus One)

Sterling, VA

Dominion Greensville County Power Station

Emporia, VA

US Cold Storage Warehouse Expansion

Warsaw, NC

Navy Federal Credit Union Headquarters

Vienna, VA

REI @ Pike & Rose

North Bethesda, MD

Virginia Tech – Brodie Hall

Blacksburg, VA

Rowan University Rohrer College of Business

Glassboro, NJ

Grosvenor Heights

Bethesda, MD

Ambler Savings Bank

Ambler, PA

Village at Valley Forge

King of Prussia, PA

Home Depot

Cherry Hill, NJ

I-95 Express Lanes Post and Panel Walls

Prince William to Fairfax County, VA

Tappan Zee Hudson River Crossing

Nyack, NY

Fairfax County Public Safety Headquarters

Fairfax, VA

Rex Hospital Parking Garage

Raleigh, NC

Arlington Cemetery – Millennium Project

Arlington, VA

PortSouth Bryla Distribution Facility

Carteret, NJ

Potomac Yard Park North Pond Walls

Alexandria, VA

Court House Metro Plaza

Arlington, VA

Milton Wastewater Treatment Plant

Milton, PA

Walker Jones School

Washington, DC

Howard University Residence Halls

Washington, DC

New Belgium Brewery

Asheville, NC

Martha Jefferson Hospital Replacement Campus

Charlottesville, VA

Joseph C. Scott Medical Center Addition at Rydal Park

Rydal, PA

Hershey Medical Center Centerview Parking Garage Phase II

Hershey, PA

NC Specialty Hospital

Durnham, NC

Advanced Technology Research Facility – Frederick National Laboratory for Cancer Research

Frederick, MD

Specfuel Waste to Energy Plant Addition

Philadelphia, PA

Chobani Plant and Distribution Facility

New Berlin, NY

Spirit Aerosystems Composite Manufacturing Facility

Kinston, NC

Chatham Industrial Park Bebo Bridge

Fredericksburg, VA

Castle Oil Storage Tanks

Bronx, NY

Refinery

N/A

Rappahannock Regional Jail Expansion Retaining Wall

Stafford, VA

The United States Air Force Memorial

Arlington, VA

P-132 SOF Cafeteria – NAS Oceana, Dam Neck Annex

Virginia Beach, VA

Highspire Wastewater Treatment Plant Upgrade

Borough of Highspire, PA

Lehigh County Authority Flow Equalization Tank

Allentown, PA

FDA SE Quadrant Laboratories and Office Buildings 71 and 75

Silver Spring, MD

University of Mary Washington Dormitory (Eagle Village)

Fredericksburg, VA

Virginia Commonwealth University – Monroe Park Campus Dormitory and Parking Garage

Richmond, VA

Western PA School for the Deaf New Dormitory

Pittsburgh, PA

Boyce Middle School

Pittsburgh, PA

Towson University Liberal Arts Building – Phase II

Towson, MD

Augustine North Section 10 Omega Arch

Stafford County, VA

Holiday Inn Express

Alexandria, VA

East King Street Redevelopment – Eastside Flats

Malvern, PA

Westminster Place at Carroll Village

Dillsburg, PA

TownePlace Suites by Marriott

Frederick, MD

Bethesda North Marriott Hotel and Conference Center

Rockville, MD

Sunrise at Fox Hill Assisted Living

Bethesda, MD

The Oaks at North Bethesda

Bethesda, MD

The Grays on Pennsylvania Avenue

Washington D.C.

Yale Steam Laundry Building 1 Condominiums

Washington D.C.

Virginia Tech Basketball Practice Facility

Blacksburg, VA

PPG Paints Arena

Pittsburgh, PA

Riverhounds Events Center – Highmark Stadium

Pittsburgh, PA

Cattaraugus Community Sports Complex

Irving, NY

The Hockessin Athletic Club and Parking Deck

Hockessin, DE

Riggs LaSalle Recreation Center

Washington D.C.

Richmond International Airport

Richmond, VA

I-495 Capital Beltway Slope Enhancement – HOT Lanes

Fairfax, VA

KIPP DC: LEAP Academy

Washington D.C.

Capital One Headquarters – Post and Panel Wall

McLean, VA

Mosaic at Merrifield – Parcel B

Falls Church, VA

Western Wake Expressway (Triangle Expwy SR540)

Apex, NC

Village at Leesburg – Cobb Theater

Leesburg, VA

Target Store Slope Repair

Raleigh, NC

Baltimore Washington Parkway Slope Repair at Route 197 Exit

Laurel, MD

FDA East Access Road

Silver Spring, MD

11th Street Bridges

Washington, DC

The Charlotte Midtown and The Metropolitan at Midtown

Charlotte, NC

Walmart Store #3701

Mount Olive, NC

Potomac Yard Park

Alexandria, VA

Station 650 (Landbay J)

Alexandria, VA

Sands Casino Resort

Bethlehem, PA

Naval Square Biddle Hall Annex and Townhomes

Philadelphia, PA

Bakers Centre Shopping Plaza

Philadelphia, PA

Target Rochester

Rochester, NY

Sunrise at Cresskill

Cresskill, NJ

Motiva Sewaren Terminal Expansions

Sewaren, NJ

Fort Totten Station

Washington, DC

Seafrigo Cold Storage Warehouse

Elizabeth, NJ

I-495 HOT Lanes Sound Wall

Metro, VA

Westfield Wheaton Costco

Wheaton, MD

I-395 HOT Lanes

Alexandria, VA